Rio Tinto has introduced this Portal to allow businesses to view expressions of interest (EOIs) for goods and / or services required by Rio Tinto from time to time, and to allow eligible businesses (ie. those that have completed the registration process) to submit responses to those EOIs.

Rio Tinto will decide, in its absolute discretion, which businesses that have responded to an EOI will be invited to respond to a Request Document issued by Rio Tinto for the supply of goods/services that it requires (which may be through a request for information (RFI), a request for proposal (RFP), a request for tender (RFT) a request for quote (RFQ) or any other form of request document issued by Rio Tinto).

Uploading or posting a response to an EOI does not guarantee that Rio Tinto will invite you to respond to a Request Document or that Rio Tinto will ultimately issue you with a Purchase Order or enter into a Contract with you. Rio Tinto reserves its absolute discretion in respect of these matters and will have no liability to you as a result of any decision to award or not award a contract to you.

Open EOIs Closed EOIs View EOI details
Business Unit Status EOI no. EOI Name Open date Close date Closing Time
(America/Toronto -05:00)
Location Estimated tender date
RTA Saguenay EOI-00197 Construction d’une berme stabilisatrice sur la digue nord du bassin 4 | Construction of a Stabilizing Berm on the North Dike of Basin 4 22/10/2025 30/11/2025 18:00 RTA QC Ops. Dec 2025 Register interest

Le projet se décompose en trois (3) phases distinctes :

1.Préparation de site et démolition

Dans un premier temps, l’empreinte de la future berme empiète sur plusieurs infrastructures existantes telles que la rue Drake sur une longueur de ± 500 m.lin. Il faut donc effectuer une préparation de site et une phase de démolition pour permettre l’implantation de la nouvelle berme. De plus, un chemin secondaire devra être mis en place dès le départ pour assurer une bonne circulation sur le chantier et permettre de garder la station de gaz d’Énergir, présente à proximité du chantier, accessible en tout temps.

 2.Berme stabilisatrice

Dans un second temps, les travaux civils pour la construction de la berme pourront débuter par l’excavation de la clé de cisaillement et du remblayage de celle-ci avec un matériau d’emprunt de type pierre dynamitée 0-600 mm. Un drain en pied de la berme sera à installer. Il est important de mentionner que, pour cette étape, une largeur d’excavation maximale de 50 m est tolérée, puisque les excavations seront au pied de la digue (éviter de créer des points de faiblesse sur la stabilité de la digue actuelle). Par la suite, une autre partie des travaux consiste à remplacer les regards (6) du système de drainage existant des eaux de résurgence de la digue. Ce drain de captage est conservé et doit être protégé lors des excavations. Pour le remblai de masse, la géométrie de la berme est constituée de quatre (4) paliers distincts, et une séquence de travaux sera établie afin de construire un palier à la fois.

3.Aménagements finaux

3.1. La dernière phase des travaux concerne principalement la modification du drainage de l’intersection de la rue Drake et de l’Usine de Filtration des Résidus de Bauxite (UFRB). La mise en place de la berme impacte le réseau de drainage de lixiviat de la route de contingence. Il faut donc reconstruire une partie de ce réseau pluvial.

3.2. De plus, une reconstruction complète de la rue Drake est planifiée sur l’un des paliers de la berme.

3.3. Le projet engendre des volumes importants de déblai de 2e classe. Ceux-ci, selon leur critère de contaminant, pourront être réutilisés pour la construction d’un mur coupe-son, localisé à proximité de la barrière Ouest du SDRB.

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

The project involves installing a stabilizing berm made of blasted rock fill to comply with an internal standard that is more stringent than current legislation. The supply of blasted rock fill materials is a critical point for the project.

The project is divided into three (3) distinct phases:

1. Site Preparation and Demolition

First, the footprint of the future berm overlaps several existing infrastructures, such as Drake Street over a length of approximately 500 linear meters. Therefore, site preparation and demolition work must be carried out to allow the installation of the new berm. Additionally, a secondary road must be established at the outset to ensure proper traffic flow on the site and maintain continuous access to the Énergir gas station located near the work area.

2. Stabilizing Berm

Next, civil works for the berm construction will begin with the excavation of the shear key and its backfilling using borrowed material consisting of blasted rock (0–600 mm). A toe drain for the berm will also be installed. It is important to note that a maximum excavation width of 50 m is allowed for this step, as the excavations will be at the toe of the dike (to avoid creating weak points that could compromise the stability of the existing dike). Furthermore, part of the work involves replacing six (6) manholes of the existing drainage system for seepage water from the dike. This capture drain will be preserved and must be protected during excavations. For the mass backfill, the berm geometry consists of four (4) distinct tiers, and a work sequence will be established to construct one tier at a time.

3. Final Arrangements

3.1 The last phase mainly concerns modifying the drainage at the intersection of Drake Street and the Bauxite Residue Filtration Plant (UFRB). The installation of the berm affects the leachate drainage network of the contingency road, so part of this stormwater network must be rebuilt.

3.2 Additionally, a complete reconstruction of Drake Street is planned on one of the berm tiers.

3.3 The project generates significant volumes of Class 2 excavated material. Depending on contaminant criteria, these may be reused for constructing a sound barrier located near the West Gate of the SDRB.

US Borax EOI-00195 Supply of IBC packaging 01/10/2025 25/01/2026 18:00 US Borax May 2026 Register interest

US Borax use various IBC bags to send our product to customers. We have 17 specifications. We have two groups of 4 bags and one group of 2 bags that are materially the same with 7 specifications that are unquie. The bags are typical mining grade bags.

RTA Saguenay EOI-00198 Nettoyage Industriel | Industrial Cleaning Lac-Saint-Jean Saguenay 03/11/2025 01/03/2026 18:00 RT Quebec Operations complexe industriel | industrial complexe Apr 2026 Register interest

Objet du contrat

Fournir des services de nettoyage industriel sécuritaires, efficaces et de qualité supérieure afin de :


Assurer la continuité des opérations minières sans interruption.

Maintenir des normes d’hygiène rigoureuses.

Garantir la conformité aux exigences environnementales et aux réglementations en matière de santé et sécurité.


Portée des services

Le fournisseur devra mettre à disposition, sans s’y limiter, les équipements suivants :


Camions aspirateurs

Systèmes de jet d’eau à haute pression

Camion à vapeur

Camion à eau chaude

Camion-citerne d’eau

Camion pour vidanges de fosses septiques

Hydro-vac

-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Contract Objective

To provide safe, efficient, and high-quality industrial cleaning services in order to:


Ensure the continuity of mining operations without interruption.

Maintain rigorous hygiene standards.

Ensure compliance with environmental requirements and health and safety regulations.



Scope of Services

The supplier must provide, including but not limited to, the following equipment:


Vacuum trucks

High-pressure water jet systems

Steam truck

Hot water truck

Water tanker truck

Septic tank cleaning truck

Hydro-vac

RTA Kitimat EOI-00101 Carbon South Pitch Tank Building | Bâtiment du réservoir de brai – Carbone Sud 14/02/2025 31/03/2026 18:00 RT BC Works Jun 2026 Register interest

Add fire retardant coating

Ajouter un revêtement ignifuge

RTA Kitimat EOI-00117 Reduction SPECIALTY | Réduction SPÉCIALITÉ 14/02/2025 31/03/2026 18:00 RT BC Works Jun 2026 Register interest

Building 3-Year Rail Runway Inspection

Inspection de la piste ferroviaire sur 3 ans

RTA Kitimat EOI-00127 Kemano Power Lines SPECIALTY | Lignes électriques de Kemano SPÉCIALITÉ 27/02/2025 31/03/2026 18:00 RT BC Works Kemano Jun 2026 Register interest

Ref NRM 0087-3 Re-coat towers in Esatuary | Réf NRM 0087-3 Repeindre les tours dans l’estuaire

RTA Kitimat EOI-00128 Kemano Power Lines Structural | Lignes électriques de Kemano Structurel 27/02/2025 31/03/2026 18:00 RT BC Works Kemano Jun 2026 Register interest

Ref NRM-0087-2 Tidal Area foundations degradations repairs

Réf NRM-0087-2 Réparations des dégradations des fondations en zone de marée

RTA Kitimat EOI-00129 Kemano Power Lines Structural | Lignes électriques de Kemano Structurel 27/02/2025 31/03/2026 18:00 RT BC Works Kemano Jun 2026 Register interest

REF NRM 0086-1 Correct corrosion on structure members

Réf NRM 0086-1 Corriger la corrosion sur les éléments structurels